Skip to content
All posts
#takeoff#estimating#construction

How to Do a Concrete Takeoff

A concrete takeoff step by step: slabs, footings, columns, beams, walls, and rebar, why the numbers live on different sheets, and how Kamai joins them.

Ben Rudin
AI Researcher & Co-founder · November 20, 2026 · 5 min read

Concrete looks like the easy trade to take off. Length times width times thickness, convert to cubic yards, done. Then you open the structural set and find that the slab's area is on S-101, its thickness is in a section on S-301, the footing sizes are in a schedule on S-001, and the rebar is in another schedule again.

That is the real work of a concrete takeoff. The arithmetic is simple. Finding the three numbers that belong together is not.

What a Concrete Takeoff Is

It is the process of working out, from the drawings and specifications, how much concrete and related material a project needs: volumes for slabs, footings, columns, beams, and walls, plus reinforcement and the measurements formwork depends on.

Concrete is a three-dimensional material drawn in two dimensions. A plan tells you where an element is and how big it is horizontally. A section or detail gives you the vertical dimension. A schedule defines member sizes and reinforcement. A reliable quantity needs all of them.

Step 1: Collect the Whole Structural Set

Start with the latest revision of everything: foundation plans, framing plans, structural sections, enlarged details, column and beam schedules, general structural notes, and rebar schedules. A takeoff from one sheet is incomplete by definition, because the dimension you need is usually on another one.

Step 2: Identify Every Concrete Element

List what the project actually contains. Depending on the job that can be slabs on grade, elevated slabs, continuous footings, spread footings, piers, columns, beams, structural walls, shear walls, depressed slabs, and joints.

Each is a different kind of problem. A slab is area and thickness. A footing is length, width, and depth. A column is a cross-section and a height. A beam is a cross-section and a span.

Step 3: Find the Dimensions

This is where the hours go. The dimensions rarely sit next to the element. Slab thickness is in a section. Column sizes are in a schedule, keyed to marks on the plan. Wall thickness may be in a note. The estimator's job is to chase each one down and attach it to the right element.

Step 4: Calculate the Volumes

The base formula is the one everyone knows:

Volume = Length × Width × Thickness

For a rectangular slab, plan area times thickness. For a footing, length times width times depth, taking care not to assume one size runs the whole foundation. For columns and beams, the section from the schedule times the height or span from the plan. For walls, length times height times thickness, keeping different wall types apart.

Slabs deserve particular care. Slab on grade, elevated slabs, depressed areas, and thickened edges all change the volume, and they are easy to flatten into one number by mistake.

Step 5: Take Off the Reinforcement

Volume is only part of the scope. Rebar schedules give bar size, spacing, length, and quantity, and the work is connecting each schedule entry to the element it reinforces. On many jobs reinforcement is a large share of the material cost, and it is the part most often rushed.

Step 6: Check the Specifications

Quantities alone do not make an estimate. Concrete strength, usually given as a PSI requirement, and member-specific conditions come from the structural notes and specs, and they change the price of every yard.

How Kamai Does It

Kamai treats the structural set as connected information, not a stack of separate pages. It reads foundation plans, structural sections, rebar schedules, and column and beam schedules together, and it:

  • identifies concrete elements and types them from the drawing legend
  • takes areas from the plan and thickness from the sections
  • joins column and beam schedules to the members on the plan
  • calculates volumes from the combined geometry
  • parses rebar schedules and reconciles them with the elements they reinforce
  • carries concrete strength through where the drawings give it

The result is a typed record for each element: an identifier, the element type, its concrete volume, reinforcement where available, strength where available, and the sheet it came from.

Why the Source Matters

A large foundation volume with no context is hard to check. Which footings produced it? Kamai keeps each quantity tied to its source drawing, so during review, or after a revision, you can trace a number back to the elements behind it. That is the difference between measuring a drawing and building data you can reuse.

PDFs and Scans

Most structural sets still arrive as PDFs, some exported from CAD and some scanned. Kamai works from both, and does not need a BIM model before extraction can start.

Does This Replace the Estimator?

No. Constructability, site conditions, labor and equipment, subcontractor pricing, waste, overhead, and markup are judgment, and they stay with the estimator. What changes is where the estimator starts. Instead of building every quantity from an empty sheet, you review a structured takeoff and put your time into scope and price. The quantities can be exported into your estimating workflow or pulled through the API.

Frequently Asked Questions

What is included in a concrete takeoff?

Concrete volumes for slabs, footings, columns, beams, and walls, along with reinforcement quantities and the other measurements needed to price the work.

How do you calculate concrete volume from drawings?

Find each element's dimensions and multiply length, width, and height or thickness. Irregular elements have to be broken down from the structural drawings.

Where does slab thickness come from?

From structural sections, details, schedules, or notes. It is often not on the plan, which is why a complete takeoff reads several sheet types together.

Can Kamai calculate concrete volume?

Yes. Kamai uses the structural drawings to calculate volumes for slabs, footings, columns, beams, and walls.

Can Kamai extract rebar quantities?

Yes, where the drawings carry a reinforcement schedule. Kamai parses it and ties the quantities to the elements they reinforce.

Is an automated concrete takeoff still reviewed by an estimator?

Yes. The extraction is a structured starting point. The estimator reviews the quantities, checks the assumptions, and applies pricing.

Get the next post in your inbox.

Low frequency. High signal.